My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133292
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:59 PM
Creation date
11/26/2007 1:03:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002094
IBM Index Class Name
Permit File
Doc Date
1/16/2003
Doc Name
Decision Letter
From
DMG
To
Maverick Sand & Gravel
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # : 01 a <br />Date : 01/15/2003 <br />User: SSS <br />State :Colorado <br />County :Montrose <br />Site :Allen Pit <br />Agency or organization name : DMG <br />Permit or other job action :New 112c Permrt <br />Task description :Full backffll of <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine : Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Ownership. cost/hour : $53.00 NA <br />Operating cosUhour : $87.21 100 <br />Ripper op. cosUhour : $0.89 10 <br />Operator cost/hour : $24.01 NA <br />Total unit cost/hour : $165.10 Total Fleet cost/hour <br />volume : 25,000 CCY <br />$165.10 <br />Swell Loose <br />factor : 1.110 volume : 27,750 LCY <br />Source of estimated volume :Assume 2-300'L x 30'H walls backfilled fo 2.5H:1 V <br />Source of estimated swell factor :CAT Handbook <br />Source <br /> Operator skill : 0.75 (av; <br />Average push distance : 315 feet Material consistency : 1.10 (Cat <br />Unadjusted howdy production : 408.5 LCY/hr Dozing method : 1.00 (ge, <br /> Visibility : 1.00 (av. <br />Material consistency description : Job efficiency : 0.83 (lshift <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd <br /> Push gradient : 1.21 (Cat <br />Average push gradient : 9.50 % (neg) Altitude : 1.00 (Cat <br />Average site altitude : 6,570 feet Material weight : 0.82 (Cat, <br /> Blade type : 1.00 (S/Sl <br />Material weight : 2,800 Ibs/LCY Net correction : 0.55 <br />Weight description <br />Clay - Natural bed Adjusted unit production : 223.21 LCY/hr <br /> Adjusted fleet production 223.21 LCY/hr <br />~`.% 1U`~,y%}lY~,~ e~ x~:.~-R [ y <br />brte~ '~' i*~; S.w. f.*Y~ `i tx`..~; 2`_ .~.'. <br />,IOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 124.32 Hours <br />Unit cost : $0.740 /LCY Total job cost : $20,527 <br />Permitlob# : M2002-094 <br />Abbreviation :none <br />Filename : M094-O1a <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.