Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date: 15~1an-2003 Permit orjob no.: M-2002-094 Site : Allen Pit <br />User: SSS Abbreviation: none State : Colorado <br /> Filename : M094-000 County : Montrose <br /> Agency or organization name : DMG <br /> Permit or job action :New 112c Permit <br /> '~ `" "d"ti. z n <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />N0. TASK DESCRIPTION USED SIZE HOURS COST <br />Ola -Bac~ll highwall trailing wings dozer 1 124.3 $20,527 <br />02a -Cut and fill induction of highwall advancing face dozer 1 13.61 $2,265 <br />03a rip 15 acre affected area ripper 1 20.2 $3,629 <br />04a -Replace topsoil over 15 acres dozer 1 28.9 $4,782 <br />05a -Revegetate maximum 15 acre affected area invege 2 40.0 $21,437 <br />06a -Transport reclamation equipment to/from site mobilize 4 3.4 $1,248 <br />07a lnstal12980' of 4 strand barbed win; fence @ $2.10/L.F. NA 1 80.0 $5, 228 <br /> sueroTALS: 310.58 $80,116 <br />`includes inflation factor atljustment of: NA % TOTAL DIRECT COST' $60,116 <br />.CT COSTS <br />OVERHEAD AND PROFIT- Llabliity IGSUfanCe : 1.55 % Of dlreCt total = $932 <br />Performance bond : 1.05 % of direct total = $631 <br />Job superintendent : NA"` NA NA total = NA <br />Profit : 10.00 % of direct total = $8,012 <br />`notrequired (oregp. operatorserves as super) TOTAL 0 8 P = $7, 575 <br />CONTRACT AMOUNT (direct t O 8 P) _ $57, 691 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $3,385 <br />CONTINGENCY- NA` NA total= NA <br />`contingencies accounted forat task level TOTAL INDIRECT COST= $10,959 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $71,075 <br /> <br />