My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133036
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:46 PM
Creation date
11/26/2007 12:46:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Permit File
Doc Name
COOLEY RESERVOIR AND FULTON WILDLIFE AREA PIT INTRODUCTION AND OVERVIEW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Reclamation <br />Year Phase Relation to Mining Phases and Reclamation Activities <br />Partial Reclamation <br />1-2 Phase 1 Mining of the Phase 1$ mining azea should take 2+ years. Partial reclamation <br />of this area will begin with the bacldlling of sediments created during the <br />processing of the mined sand and gravel. At the termination of mining, this <br />area will have been backfilled to a level to support wetland vegetation at the <br />conclusion of all mining, but no additional reclamation will be undertaken until <br />the completion of all mining within the permit boundary and termination of the <br />plant site operations. <br />Reclamation <br />1-4 Phase 1 The slurry wall should be installed within 1± year. Reclamation of the areas <br />disturbed by slung wall construction will constitute part of Reclamation Phase <br />1. The excavated area over the slurry wall will be covered with overburden <br />and 6-12"± of topsoil and revegetated with non-irrigated grasses as outlined <br />on page 6. Except for a periphery road between the slurry wall and fencing, <br />the area between the fence and edge of excavation will be maintained with <br />non-irrigated grasses as outlined on page 6, and no additional reclamation <br />activities should be required, except for replanting as needed for up to a 3 <br />year period. <br />Reclamation <br />1-4 Phase 1 ytecsttiir _ <br />Reclamation of the areas disturbed by installation of the conveyor's support <br />structures will constitute part of Reclamation Phase 1. Any areas disturbed <br />in the installation of the support structures will be revegetated with non- <br />irrigated grasses as outlined on page 6, and no additional reclamation <br />activities should be required, except for replanting as needed for up to a 3 <br />year period. <br />Reclamation <br />2-6 Phase 2 - Mining of the Phase 2 mining area should involve 2+ years. The area will be <br />Reclamation Phase 2. All backfilling, sloping, replacement of 6-12"+ topsoil, <br />and revegetation with non-irrigated grasses as outlined on page 6 should begin <br />within the phase after mining is completed in this phase. Revegetation of non- <br />irrigated grasses as outlined on page 6 should begin in the 3rd year, be <br />completed in the 4d' year, and be fully established by the 6'" year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.