Laserfiche WebLink
<br /> <br />ACMU ACEC INTERIM ACTIONS FOR CULTURAL RESOURCES <br />SITE/AREA OBJECTIVES <br />(Outcome desired) ACTION <br />c) Stabilization of SMT127. <br />d) Stabilization of SMT132. <br />e) Stabilization of SMT134. <br />f) Stabilization of 5MT261. <br />g) Stabilization of S~1T1830. <br />h) Evaluation of stabilization needs for SMT... 1806, <br />1803/1804, 135, 1826, 1827, 264, 1831, 1829, 2799. <br />i) Site monitoring and visitor contact during peak <br />use season (2 days per week from 3/1 to 1111)• <br />j) Close and reclaim jeep trail up East Rock Canyon. <br />Cannonball Ruin <br />1) Improve data base. a) Transit map features, rooms, and use areas. <br />2) Protection. a) Repair fence and install new lock. <br />b) Backfill trash area and install mesh barrier to <br />prevent further erosion and excavation. Target <br />area below lower tower. <br />c) Stabilize retaining wall below portion of south <br />rim. <br />3) Interpretation and a) Research collections and if desirable, acquire <br />enhancement. artifacts from Chicago field museum (with S. <br />Morleys notes, etc.) from the 1908 excavations. <br />Mockingbird Mesa <br />1) Improve data base and a) Produce detailed site map of Seven Towers Pueblo <br />provide information (SMT1000). <br />to the public. <br />11 <br />