Laserfiche WebLink
1 . • • <br />Minor Disturbance <br />7. Seed, fertilize, mulch <br />slope and setback <br />8. Reseeding <br />9. Mobilization/De- <br />SUBTOTAL <br />TOTAL <br />I I I I <br />I I I I <br />I I I I <br />I I I I <br />I I I I <br />I I I I <br />$ 630.00 <br />$64,773.00 <br />mobilization I 1.0 I EA I $500.00 IS 500.00 <br />I I I I <br />10. Indirect costs I 1.0 I EA I 15.78 IS10,280.00 <br />GRAND TOTAL S75,553.00 <br />Total disturbance at any time = 29.5 acres <br />Reclamation cost per acre = 52,561.00 <br />