Laserfiche WebLink
~~ ~ _ <br />~II II~~I~~I~~~~~ ~I~ <br />sss <br />EXHIBIT L <br />RECLAMATION COSTS <br />These reclamation costs are based on the maximum amount of <br />disturbance which would occur during the mining operation. We have <br />identified this point when the mining is about half way through <br />Phase I, when the portable asphalt batch plant is located on the <br />site, the portable crusher/screening plant is on the site, <br />stockpiles of off-site material (mainly concrete and asphalt for <br />recycling) are located on-site and there are approximately 2-3 <br />years worth of stockpiled overburden and topsoil. <br />This exhibit corresponds with the Table of Disturbance in Exhibit <br />D. The main access road will remain after mining to provide access <br />to the Barrett Energy gas well on the property. This road has not <br />been included in the disturbance calculations. <br />Maior Disturbance <br />Item <br />No. Item <br />Cost/ <br />Amount Units Unit Cost <br />1. Replace overburden on I I I I <br /> 3 acre stripped area 1 9,680 I CY I $ .80 I$ <br />I 7,744.00 <br />2. Additional overburden re- I I I <br />I I <br />I I <br /> distribution 1 20,320 I CY 1 $ .80 1$16,256.00 <br /> <br />3. I <br />Scarify overburden and I <br />I I I <br />I I <br />I <br /> topsoil stockpile areas, I I I I <br /> 4.0 acres 1 19,360 I SY I $ .15 1$ 2,904.00 <br /> <br />4. <br />Spread topsoil at 6-12" I I <br />I I <br />I <br />I I <br />I <br /> on 3 acre stripped area I I I I <br /> and 2.5 acre setback and I I I I <br /> slope area 1 8,873 1 CY 1 $ .80 1$ 7,099.00 <br /> <br />5. <br />Seed, fertilize, mulch I <br />1 9.5 I I <br />AC 1 I <br />$500.00 I <br />1$ <br />4,750.00 <br />SUBTOTAL $38,753.00 <br />Moderate Disturbance I I I I <br />I I I I <br />6. scarify two plant sites, I I I I <br />scale house I I I I <br />I I I I <br />7. Seed, fertilize, mulch I I I I <br />SUBTOTAL $25,390.00 <br />L-1 <br />