Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $56.27 1 $56.27 $56.27 <br />-Water Tanker, 3,500 Gal. $53.52 1 $53.52 $53.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $109.79 $109.79 <br />EQUIPMENT HAUL DISTANCE and TIME <br />sheet 2 of 2 <br />Nearest major city or town within project area region : Meeker <br />Transportation Cvcle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost ' : $677.20 <br />Return time (hours) = 0.14 0.14 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** $31.37 <br />Unloading time (hours) = 0.50 NA "one round tdp, no haul ng <br />Subtotals = <br />- - 1.29 0.29 <br />_. - _ <br /> <br />w. , <br />i <br />JOB TIME AND COST Total job time : 2.57 hours <br /> Total job cost : $709 <br />