Laserfiche WebLink
CIRCES Cost Estimatinn Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : OSa State : Co/orado <br />Date :04/11/2006 County :Rio Blanco <br />User : GRM Site :Russell Ranch Pit <br />sheet 1 of 2 <br />Permit or other job action :Initial Reclamation Liabilty Estimate <br />Task description :Initial Mobiliztion to site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2005) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $25.36 $28.12 $34.53 <br />Operating cosUhour : $36.15 $37.62 $41.10 <br />Operator cosUhour : $27.40 $27.40 $27.40 <br />Helpercost/hour : $0.00 $25.15 $25.15 <br />Total Unit CosUhour : $88.91 $118.29 $128.18 <br />unN_RnAnARI F Fn111PMENT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(NO. units) Haul Trip <br />Cost/hr/fleet Retum Trip <br />CosUhr/fleet DOT permit <br />CosUfleet <br />-Cat D7R DS Series I! - 7SU 35.17 $43.17 $118.29 1 $161.46 $118.29 $0.00 <br />-reveg equipment 10.00 $20.00 $88.91 1 $108.91 $88.91 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $270.37 $207.20 $0.00 <br />PermiUjob # : M-2006-008 <br />Abbreviation :none <br />Filename : M008-05a <br />