Laserfiche WebLink
RDOEidDUld t10. 1 <br />• <br />Contractor is required to chip and stockpile all vegetation <br />for use as mulch material in our subsequent revegetation <br />efforts. All disturbance to vegetation and wildlife shall <br />be {:ept to a minimum. <br />kRCO will be responsible for all revegetation ~+ork at the <br />14t. Gunnison h~ine. The Contractor shall rip all final grade <br />surfaces v+hich will be revegetated. These operations, plus <br />vegetation removal and topsoil removal and replacement, should <br />be coordinated with the on-site Environmental Coordinator <br />before actual ~.+ork begins. The Environmental Coordinator will <br />then contract for and oversee the actual seedbed preparation, <br />planting and mulching operations so that they are in accord <br />with the best reclamation techniques and regulatory requirements. <br />~• <br />?2/24/80 <br /> <br />