Laserfiche WebLink
l <br />' support facilities. <br />The access route [o the entrance of the Sylvz~~cz Gulch Aclit <br />• is from the east end of the Bcar t:i:ie following a rigl:i:-of-::ay <br />f~+r a distance of appro::inately 10,000 feet. The access routs to the iit. <br />Gunnison Mine # 1 is frox the crest end of the Bcar Nine follo:;ing a <br />right-of-way for a distance of approximately 2,400 feet. The areas <br />encoapassed by the coal preparation plant site, three proposed damp <br />sites ar,.d she related imp+act areas are illustrated in Figure 1. <br />Areas immediately adjacent to the imp2ct locali*_ies were a?so investi- <br />gated. T.ie total surface area irvol.ved in the recoraaissance a±anu^t° <br />to ap~roxiccately 3.10.3 acres. <br />location <br />The project area is about ore and one half (lz) air miles <br />east-scutheaet of Sca:ers~t, Colorado in Sections 9, 10, I5, 16, 21, <br />• and 22 0: To:raship 13 South, F.ange 90 West. Principal drainages <br />include the perv:anent straam, North Furk of the Gunnison Ri.er and <br />its Leib mazy, the ephe;~asal sir_ax, Sylvester Gaicir. <br />the proposed entrance pad to Sylvester Gulch Adit is located <br />in the St•,+'~Sld'~ of Section 15. It is to be connected to Colorado <br />Highway 133 through tare present Bear Mine by a croposed nccess route <br />that trends north for approximately 5000 feet to the SN1~SW~ of <br />Section I0, then rest for. approximately 1500 feet to the So'ySF; <br />of Section 9. <br />The proposed coil preparation plant site survey area is <br />located in the S~SE~ of Section 9 aac the S[2'ySe~%ly of Section 10. To <br /> the so~rth, in the tr~ of Section 15 is the proposed c:+.r~p site survey <br />• area. The vine support facilities survey area (pis::_e 2) lies in the <br /> ttE'~`:S~ of Section 16 and [he S;SEA of Section 9• <br />5 <br />