Laserfiche WebLink
• 2.08 Permit Revisions Summary. Cont. <br />ti11NOR REVISIONS <br /> <br /> <br />Revision <br />Number Date Approved Description <br />-- October I5, 1982 Change Position of Southern Portals <br />MR-0I unknown unknown <br />MR-02 unknown unknown <br />MR-03 unknown unAnuwrr <br />MR-04 May 28, 1987 Upgrade Retusa Ditch, and Catchment Basins <br />MR-05 August, 1988 1988/89 Exploration Drilling Proje~K <br />MR-06 September 26, 1988 Light-Use Road at Sediment Pond <br />MR-07 September 8, 1989 Trailer Relocation Site <br />MR-08 June 3, 1993 Mine Name Change <br />MR-09 August 22, 1994 Responses to Stip. No. 14 of TR-14 <br />MR-10 (Withdrawn 1/95) Design Modifications to Cleanwater Diversions 1 & 2 <br />MR-l I July 10, 1995 Refuse Ditch No. t Reconfiguration <br />MR-13 February 20, 1996 Permit Updates: Section 203 <br />MR-13 November 24, 1997 Vegetation Monitoring Requirements <br />MR-14 December l9, 1997 Reclamation Timetable <br />MR-IS withdrawn RN-03 Responses -Part 1 <br />hJR-16 hlay 15, 1998 Drainage Change-Road Crossing <br />MR-17 March 24, 2000 Interseeding Non-tops<~iled Area, <br />667b Revised: 2/14/01 <br />Technical Revision No. 21 <br />