Laserfiche WebLink
• '.08 Permit Revisions Summary. Cont. <br />TECHNICAL REVISIONS <br /> <br />• <br />Revision <br />Number Date Approved Description <br />TR-13 (Withdrawn 519.4) Alternative Land Use - Bh Load~un <br />TR-14 July 8, 1994 Revised Reclamation Plan <br />TR-IS February 8, V995 Upland Diversionti Desibm Muditicationti <br />TR-16 April 17, 1995 SAE Demonstrations -Trailer Pad & CWDJ11 <br /> Disturbance <br />TR-17 May 5, 1995 Postmining Structures <br />TR-I8 May 4, 1995 Check Dam Designs <br />TR-l9 September 5, 1995 Request for Required Pertbrmance Bond Amount <br />RN-03 September 8, 1998 Permit Renewal No. 3 <br />TR-20 August 21, 1997 Refuse Ditch Extension <br />TR-21 pending Mid-Term Responses <br />667a Revised: 2/ 14/OI <br />Technical Revision No. 2l <br />