Laserfiche WebLink
Carlton Tunnel in excess of 4.0 CFS. A study is underway to determine <br /> the eventual water source to be used. All available .water from the ~ <br /> <br />l _ <br /> ated for milling purposes. <br />tailings ponds will be recircu <br /> 4. There will be no acid drainage from ore or waste <br /> stockpiles as evidenced by the alkaline nature of the district and <br /> the past history of the district operations. <br /> 5. The concept of ponding tailings in the existing tail- <br /> ings dams has been rejected in favor of stacking tailings in the area <br /> immediately south of the Mill. The tailings- will be thickened to <br /> approximately 70% solids and pumped to the stacking area where cyclones <br /> will remove the sands and layer them on terraces 50' wide. The slimes <br /> portion will be sprayed. onto the previously deposited layer of sands <br />~ <br /> on the adjacent terrace to evaporate and drain. Drainage around the s ` <br />Q r:~~;~2 <br /> Y <br /> pile will be collected by a small berm and settling pond and recycled k,~^'S <br /> to the Mill. <br />C Run off will be redirected by two channels on the east <br /> and west of the tailings area. <br /> Terraces will be designed with an overall slope of lOX <br /> in that they will be 50' wide and have a face of 5'. <br /> 6. Additional details required under Rule 2./12(7) are <br /> ~- (c) The estimated water requirements for mining, <br /> <br /> ' milling and reclamation are expected to be at <br /> - a rate of 70 GPM. The annual volume is antici- <br />gated to be 26,200,000 gallons. <br />(d) Cripple Creek & Victor Gold Mining Co. Water Rights: <br />All water, ditch and reservoir rights, including <br />wells and well rights, and easements and rights-of-way <br />~e~ <br /> <br />_..~ i1Q43$4 <br />