Laserfiche WebLink
• Culvert C-El <br />Culvert C-El was deleted from the design Jan. 1998. <br />Ditch D-Fl & Culvert C-Fl <br />Ditch D-FI is a continuation of the haul road ditch beyond sediment pond C. There is virtually <br />no drainage azea for this ditch portion because all of the upland drainage is handled by the gob <br />pile ditches. For the design of D-F 1 see page 8-74 and the ditch summary page 8-29. For the <br />design of culvert C-F1 see the culvert summary page 8-31. <br />Ditch D-F2 & culvert C-F2 <br />See page 8-75 and the ditch summary page 8-29. For the design of culvert C-F2 see the culvert <br />summary page 8-31. <br />Ditch D-F3 <br />See page 8-76 and the ditch summary page 8-29 <br />Ditch D-Gl <br />See page 8-77 and the ditch summary• page 8-29. <br />• Ditch D-G2 & Culvert C-G4 <br />See page 8-78 and the ditch summary page 8-29. For the design of culvert C-G4 see the <br />culvert summary page R-31. <br />Culvert C-Gl <br />For the design of culvert C-G I see page 8-32i and the culvert summary page 8-31. <br />Culvert C-G2 <br />For the design of culvert C-G2 see page 8-32ii and the culvert summan~ page 8-31. <br />• <br />TR-03 EXH-8 -16 - 6/98 <br />