My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132678
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:26 PM
Creation date
11/26/2007 12:23:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/15/2002
Doc Name
pages Exh 8-1-Exh 8-80i
Section_Exhibit Name
Exhibit 08 Protection of the Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Ditch D-D2 <br />Ditch D-D2 is formed when the (low from ditch D-D I and ditch D-E I join below sediment <br />pond C. From the intersection of the Iwo flows the ditch becomes a V-Ditch (hat must be <br />capable of handling the combined (low from the two ditches (2 9G + 14.62) = 17.58 cfs. <br />The following information is generated from the use of the computer program Flaestad <br />Methods FlovvMastcr I version 3.43 <br />The ditch side slopes are I .Sh: I v, Mannin6 s n = .03. <br />Ditch Flow Velocil_v <br />Flow cfs Grade Depth fps <br />17.58 2'% I.5 5.1 <br />17.58 10"/o I.1 9.4 <br />Construct Ditch D-2 hvo feel deep to allow for freeboard. The section wish the 10"/o grade will <br />require gunnite riprap or riprap and concrete lining for erosion protection. <br />Culvert C-DI <br />Culvert C-D I is located in ditch D-D2. The cuh-erl must be 3U" in diameter to handle the <br />• 17.58 cfs flow. Ditch D-D2 must be constructed at least 30" deep al the Iransilion behveen the <br />ditch and culvert. <br />Drainage Area E <br />Drainage area E is the upland area located above the haul road that provides access to the gob <br />pile. A berm will be constructed along the south side of the road to contain run-ofT to the site. <br />A single ditch will be constructed on the north side of the road to hmrdle the flow from drainage <br />area E. The peak (lo~v for tltiis area is 3.f.3 cfs. <br />Ditch D-El <br />The following information is generated from the use of the computer program Flaeslad <br />Methods FlowMasler I version 3,43. <br />The ditch side slopes are l .5h: I v, Marmin~ s n = .O3. <br />Ditch Flow Velocity <br />Flow cfs Grade Depllr fps <br />3.G3 2'%, 0.84 3.4G <br />Construct ditch D-EI hvo feel deep to allow for freeboard. <br />• Ahernative sediment control features will be inslnlled in the ditch to trap sediment before it <br />leaves the sire. <br />TR-0I <br />EXH-8 -1 S - <br />T~-o ~ <br />9/97 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.