• There are no coal processing facilities nor are any proposed at the New Horizon 2 area. All of the <br />coal is transported to the power station by a transportation contractor. Reject rock from a rotary <br />breaker at the power plant may be transported back to the mine site and deposited in the pit at least <br />10' below the subsoil level. <br />Non-coal wastes shall be periodically transported to the county landfill. Trees and brush removed <br />in the site clearing process maybe chipped and used for mulch or pushed into an adjacent mined <br />out pit and buried. <br />The table below describes the time sequence of the mining within the NH2 permit area. <br />TABLE 2.05.3-1 -TIMING OF OPERATIONS <br />• <br />ITEM DESCRIPTION DATE <br />1 Install Enstrom, Wilcox, Johnson access road from Morgan road Start 2003 <br />2 Mine through 2700 Road going west. Mid 2003 <br />3 Place 2700 Road and BB Road in original locations as a gravel surtace. <br />Continue using detour. Restore West Lateral Ditch in permanent <br />pipeline location. Mid 2008 <br />4 Pave 2700 Road and BB Road in original locations and restore <br />Sunshine Ranch Corner intersection. Also lay power and phone lines in <br />original locations. Mid 2008 <br />5 Remove BB Road detour and reclaim road area End 2008 <br />6 Mine west to last cut at western permit boundary End 2010 <br />7 Backfill final cut with overburden stockpile Mid 2011 <br />8 Re-topsoil and re-vegetate final cut area End 2011 <br />9 Replace BB Road from Sunshine Ranch Corner to western boundary. <br />Also re-install power lines and phone lines along road. End 2011 <br />10 Continue to irrigate and monitor reclaimed areas until final bond <br />release. Many areas will be given back to the original owners, especially <br />irrigated areas, much earlier than the date shown here. Start 2022 <br />• (Revised 9/2002) 2.05.3-4 <br />