Laserfiche WebLink
RECLAMATION COST SUNARY eont'd thee[ 4 of 4 <br />• K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />3 ~ Neul fill, old ports lc ~ ~ f3, 178 <br />4 ~ fill old portals ~ 5731 <br />15 ~ Xaul fill, raw portals ~ 53,178 <br />16 ~ Fill r~eN portals ~ f731 <br />Subtotal (K): f7, 818 <br />L. DRILL ROLE/MONITORING YELL SEALING <br />Task Mo.~ Task Description ~ Cost (f) <br />~_____ <br />1< ~ Seal vent hole ~ 5871 <br />Subtotal (L): f871 <br />• <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Tssk Mo.~ Task Descri pion ~ Cost (f) <br />~___~_ <br />2 ~ Demolition ~ 523,710 <br />77 ~ Seeding ~ f4,318 <br />ferc irg <br />7 ~ Mob/Demob ~ f3,071 <br />Subtotal (M): 531,099 <br />____________ <br />TOTAL DIRECT RECLAMATION COSTS (cub[otelc A through M): 562,424 <br />!!. IND lRECT CO5T5 <br />A. CONTRACTOR'S OVERXEAD i PROFIT <br />l tam No.~ Item Description ~ Lost (f) <br />1. ~ Pi6Lic Liability Irtturarce.... 1.SSDX of dir. ~ f968 <br />2. ~ Contreetor's Performerce Bold 0.975X of dir. ~ 5609 <br />3. ~ Cmtrector's Profit........... 10.OOX of dir. ~ fb, 242 <br />4. ~ Job Superintendent..task 19 ~ 53,430 <br />Subtotal (A): f1T, 249 <br />____________ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 f P): f73,672 <br />____________ <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />I tea No.~ Item Descriptim ~ Cost (f) <br />1. ~ Contract Prep., Eng. Fees..... 4.25% of cntr.~ 53,137 <br />2. ~ Staff Admin. Expenses......... 0.75% of cntr.~ f553 <br />'NET INDIRECT COST PERCENTAGE: 23.92X Subtotal (B): 53,684 <br />. TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B):_- -514,932- <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 577,356 <br />June 199 <br /> <br />