Laserfiche WebLink
RECLAMATION COST SU4UIRY emt~d sheet 3 of < <br />• N. EARTMYORK -STREAM CHANNEL RECONSTRUCTION <br />Tesk Yo.l Tesk Description I Cost (f) <br />I I <br />20 I Reconstruct stream charnels I (1,500 <br />I 1 <br />I I <br />I I <br />S~totel (X): f1,500 <br />1. EARTXNORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Tesk Description I Cost (S) <br />I I- <br />18 I Resgve ponds I 5628 <br />I I <br />I I <br />I I <br />• <br />Subtotal (I): 5628 <br />eesve cacao <br />J. EARTXYORK -TOPSOIL/SUBSOIL REPLACEXENT <br />Tesk No,l <br />I Task Description I Cost (f) <br />I <br />9 I Xeul top¢oi 1, facilities srea I 54,174 <br />10 I Grade topsoil, facilities area I 5689 <br />11 I Xaul topsoil, refuse area I 52,279 <br />12 I Grade topsoil, refuse area I f312 <br />• <br />Subtotal (J): (7,454 <br />JLme 1995 <br /> <br />