Laserfiche WebLink
Truek Cyele T1sw: Sheet 3 of 3 <br />• Ezchenge = 0.70 min. Adj. for altitude = 0.70 min. <br /> Lod = 3.190 min. • • • = 3.19 min. <br /> Nanewer i duip 1.20 min. • • • . 1.20 ~i n. <br /> Travel Time (haul i return): <br /> Rod cond. descr.:RUttd dirt road, little/ro mein[., 1-2• tare perotretion <br /> Haul route <br /> Rod Length Grade Rolling Total Vel x lty Travel times <br /> seg. / (ft) res. (X) res.(X) res.(X) (fpm) (min) <br /> 1 1500 -10.00 5.00 -5.00 2640 0.80 <br />Xeul time a <br />Return route <br />1 1500 10.00 5.00 15.00 1269 <br />C , <br />J <br />0.80 min. <br />1.20 <br />•1st i last seg. dj. for eccel./decal. Return time = 1.20 min. <br />Total Truck Cycle Time = 7.10 min. <br />Loader Unit Prad.= 229.05 LCY/Xr -Adj. for efficiency= 190.11 LCT/Nr <br />Truck Unit Prod.= 125.56 LCY/Hr -Adj. for efficiency= 101.22 LCY/Hr <br />Optimal rsmixr of trucks per lolling unit 2 <br />Selectd ember of trucks per lodirg unit: 2 <br />Nourly truck teem production 208.43 LCT/Nr <br />Net Xourly Truck/Loader Teas Production 190.11 LCY/Nr <br />Met Nourly Xultiple T/L Teem Production 190.11 LCT/Nr <br />JOB COST: <br />Fleet size 7 T/L Team(s) Total Job Time: 18.41 Nours <br />• Unit Cost : f0.908 /lCT Total Jab Cost: f3,178 <br />Jlme 1995 <br /> <br />