Laserfiche WebLink
• <br />• <br />ROURLY PRODUCT ION: <br />i6 SII9 <br />Job Cardittan Corrections <br />Alt. 7,500 ft. <br />Alt. adl ustmen[ ........... <br />Jab efficl enry ...(1ch/d) <br />Net Corrections <br />Load Equipoent Cepeclty <br />Sheet 2 of 3 <br />Truck/load Teem Support Equipment <br />Truck Loader Load Aree Duip Aree <br />1.000 1.000 N/A N/A' <br />0.830 0.830 M/A M/A <br />0.830 0.830 M/A N/A <br />Rated capacity 1.500 LCY (norm rol heaped) <br />Fill material description: <br />Bucket fill factor 1.100 Other - rock dirt mixtures (100-720X) <br />Adjusted cepaeity 7.650 LCT <br />Truck Capacity <br />Height Basis: ~ Volume Basis: <br />Material Yei ght i 2,300 lbs/LCY ~ Struck capacity = 12.00 <br />Mat. description : ~ Heaped capacity = 18.00 <br />GENERAL FILL ~ ------- <br /> A 15 <br />00 <br />CY <br /> verage = . <br />L <br />Rated pey(oed = 43,000 lbs. <br />Payload volume = 18.70 LCY ~ Max. AvB• Vol une = 15.00 LCY <br />Adj. truck volume based an discreet ro. of loader passes: 14.85 LCT <br />Load Equipment Cycle Time <br />Nuober of discreet loader passes required to fill truck 9 <br />Track laeders- <br />Load meter ial deseript ion:N/A <br />Excevatorc/Shovels - cycle tine vs. job condition reti ng: N/A <br />- selected value Within basic ratirp N/A <br />Track loaders -basic cycle time elements: Load time = N/A min. <br />Maneuver time = N/A <br />Duip time = 0.07 <br />Uredj usted Basic Cycle time = 0.450 min. <br />Nheel/Track loaden- <br />Cycle Ttme Factors: Descrf ptian Factor (nin.) <br />Material -Mixed materiel 0.020 <br />Pile candit ion -Conveyor or dozer piled 10'h end up 0.000 <br />Truck Oversh ip -Coaman o~eership of trucks i loaders -0.040 <br />Operation -Carotant operation -0.040 <br />Target -MOml rel target 0.000 <br />Net cycle time adj. _ -0.060 min. <br />Adjusted Basic Cycle Time = 0.390 min. <br />• Total load time per truck ircl. exchange tine adj .• 3.790 min. <br />•(bulk of 1st psss coopleted during truck exchange) <br />June 1995 <br /> <br />