Laserfiche WebLink
<br />the BLM informing him of our plans and we also sent a certified copy of the newspaper <br />notice to him, he did not feel any of this would be a problem. <br />EXHIBIT C <br />The washing of materials process to handle run off will go as follows: <br />There will be a collection azea under the washing unit. The drainage from the collection <br />azea will be sent through a pipe back into the recharge pit with the pipe nrnning through <br />the bean which runs around the edge of the recharge pit. Any materials stock piled after <br />washing would have a relatively small amount of water still in them since most of the <br />water would come out as it is being washed. But the stockpile area would be graded to <br />feed any water left in stock pile back to the collection area and then on back into the <br />recharge pit. <br />EXHIBIT D <br />The berm aoound the outside of the rechargelgravel pit area will be a permanent fixture. <br />This azea is already vegetated. This vegetation is mostly weeds, however, with water in <br />the pit the weeds will always over take and grass we might plant. This is also the same <br />way in all of our ditches for our farm. <br />On the North pit, we will slope the areas as we dig the materials out from inside the pit. <br />Any area which we remove topsoil we will stockpile this topsoil on phase 3 section 25 of <br />this project at a 3 to 1 slope and reseed the stockpile of top soil with dryland grasses to <br />control weeds and erosion. <br />EXHIBIT F <br />We have included drawings which show you where the roads go into the recharge pit <br />areas and the North pit area. <br />I will send you a copy of the certified mail receipt as soon as 1 have it. There will be two <br />receipts one of delivery of new information the County clerk and the other where we have <br />sent a copy of the notice of our proposed mining operation which was in the Valley <br />Courier paper to Bill Miller of the BLM since our property does adjoin theirs and will be e <br />within 200 ft of the North pit area. <br />The drawing depicts the slope during construction. <br />We will also be outlining the boundary for the pit by setting a comer post at each of the <br />four corner boundaries of the pit and steel posts every 50 feet there after in between the <br />corner posts. This will keep our boundary clear so that we will stay within the designated <br />area as shown on the drawing for the North pit Section 25. The pit located in section 36 <br />which is the rechargeJgravel pit is bordered by an existing berm and will always remain, so <br />we will stay inside the designated area for removal of materials. Our stock pile area will <br />