My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132545
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:19 PM
Creation date
11/26/2007 12:15:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Part 815 COAL EXPLORATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 815.15 (c) Continued. <br />t0 minimi~r disturbance of the area. In no Gaze will a new road ford any stream or <br />wet area, unless proven to be the best alternative from an environmental point of <br />view, nor will natural drainages be diverted. Wherever needed, water bars and <br />ditches will be constructed to control nuroff. <br />As soon as these new roads are no longer needed they will be reclaimed according <br />to the requirements of 30 CFR 816.176. For additional information, see the <br />discussion under Sections 816.170-816.176. <br />(d) If excavations, artificial flat areas, or enbankments are created during exploration, these <br />areaz shall be returned to the approximate original contour promptly after such #eatures are <br />no longer needed for coal exploration. <br />Dn71 sites that are no longer needed for exploration or data collection will be <br />. returned to their approximate original contour when they are no longer needed for <br />coal exploration or subsequent data collection. <br />(e) Topso~7 shall be removed, stored, and redistributed on disrurbed areas az necessary to <br />assure successful revegetation or az required bythe regulatory authority. <br />Topsoil will be removed prior to the construction of any access road or drill site. <br />When the access roads and drill sites are recontoured, except az provided below, <br />the topsorl will be redistributed over the surface in a manner that will provide <br />successful revegetavon. If any exploration drilling is to be conducted in an <br /> <br />815-7 <br />Permit Renewa104 Revised -June 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.