My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132527
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:16 PM
Creation date
11/26/2007 12:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977573
IBM Index Class Name
Permit File
Doc Date
12/29/1977
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • ~: <br />EXHIBIT D <br />' MINING PLAN AND TIMETABLE <br /> Mining Plan. The property known as the Pueblo ~Yest <br /> Pit was purchased by Valco, Inc. in a three-stage land <br />t acquisition program. The affected land is located west of <br /> the City of Pueblo along the south side of the Arkansas <br />' River. Locations to be mined are not contiguous; thus, for <br />' the sake of clarity in this application, we have assigned <br /> designations of Area 1, Area 2, Area 3 and Area 4 to the <br />' lands owned by Valco which it intends to mine. Negotiations <br /> have been under way for some time to purchase the property <br />' which separates Areas 3 and 4 (see map Exhibit C). If these <br />' negotiations ever prove successful, Valco will amend this <br /> permit application to include the new acquisition. <br />' Before mining activity began, use of the river bottom <br /> floodplain was confined to wildlife habitat and occasional <br />' and limited cattle grazing. Area 2 was and is an irrigated <br /> alfalfa field. Area 3 was and is an irrigated tree nursery. <br />' <br /> A small stretch of property along State Highway 96 is zoned <br />' industrial. There is residential development above the <br /> cliffs south of Area 4. The land across the river north- <br />' east of Area 4 was the prison honor farm. It has been aban- <br /> doned by the Department of Institutions and is now leased <br />' f <br />i <br />f P <br />bl <br /> ue <br />o <br />or <br />ty o <br />for various farm projects and to the C <br /> recreation purposes. <br /> a. <br /> ~~ <br /> Mining began in August 1973. ubsequently, several <br />' attempts were made by Valco to obtain a rled~~~~e~l r~ition <br />' DEgqC ~p9 /1977 ((~~^1 - <br />6 NII:'e+ ~ LY1 ~n1 RcCLY, BSI r1~~lJN <br />t Culp. Gept. of Natural Resources <br />~. <br />.rt <br />
The URL can be used to link to this page
Your browser does not support the video tag.