Laserfiche WebLink
' EXHIBIT E (Cont'd) <br />will be disced or crimped in. The straw will meet SCS standards <br />' for straw mulch. <br />' Grasses. The grass seed mixture which the operator plans <br />to use has been recommended by the SCS and is as follows: <br /> Blackwell Switchgrass 25°fo 1.1Y PLS/ac.$~~5~~ - 'y;3S <br /> Elida Sand Bluestem 250 4.Or PLS/ac. ~~'-5~~ ~~~ <br />. <br /> Llano Indiangrass 25% 2.5= PLS/ac.L`+R~~ 4 <br />' Sand Dropseed 25% O.ln PLS/ac.~iRS/~ •~+~ <br /> <br />' When topography permits, a grassland dr ill wi ll be used ~/z~3 <br /> to plant the seed mixture. Se ed amount will be do ubled and <br />' will be broadcast in areas too small or too steep for drilling. <br /> Planting of grasses will occur betcveen 9pri1 1 and May 15 of <br />' each year in which planting ta kes place. <br />' Reclamation Timetable. The reclamation phases liste3 <br />below may be correlated to map Exhibits D-1 and F. The phases <br />t correspond to the mining stages and are numbered accordingly. <br />Note that these are estimates only and that variations may <br />' occur, <br /> <br /> <br /> <br /> <br /> <br />;~.,. <br />15 <br />