My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132139
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:55 PM
Creation date
11/25/2007 11:53:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981031
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Section 4: Rule 2.05
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 Specifications <br />1. Strip top 1' of loose material under dam, Scarify and compact the <br />top b inches of subgrade to 95°d compaction at optimum moisture content <br />per ASTM D698 <br />2. Place fill material in continuous horizontal layers in lifts not <br />exceeding 6 inches loose thickness and compacted to plus 95o compaction <br />and optimum moisture content (0 to plus 2°d wet). <br />3. Material for fill shall conform to the following: <br />Clays and sandy clays with a minimum of 70 percent by weight passing <br />Np. 200 sieve and having a plasticity index of 10 or more and free <br />of roots, debris, and other deleterious material. <br />4. Concrete shall have a minimum compressive strength of 3000psi, entrained <br />air equal to 5°d plus or minus 1; percent. All concrete and concrete <br />work shall conform to ACI 308. <br />- 5. Reinforcing steel shall conform to ASTM A615. <br />6. Structural Plates and shapes shall conform to ASTM A36, <br />7. CMP shall be galvinized corrugated metal pipe conforming to AASHTO <br />M36 . <br />8. Pipe material-cast iron soil pipe _ ASTM A-74 <br />9. Riprap shall be hard durable stone of durability to withstand exposure <br />to water and weathering. Riprap shall be placed on a bedding of <br />3 inch clean sand. <br />1D. Trench for conduits shall be excavated to lines shown on the drawings. <br />Beckfill shall consist of material with 100 percent passing 4 sieve <br />and from of organic and deletrious material. Computer shall be <br />to 95b Structural Proctor. <br /> <br /> <br />~a ~ 25` <br />
The URL can be used to link to this page
Your browser does not support the video tag.