Laserfiche WebLink
S'. ~ Revised <br />July 28, 1982 <br />Z OS 3(4) Ponds. Impoundments. and Diversions <br />The Colorado Mined Land Reclamation Division has undertaken a SDAP Program <br />Contract to assist the Viking Coal Company in development of hydrologic <br />baseline information. The surface water hydrology of the SDAP Contract is <br />necessary prior to any detailed design of sediment or diversion ditch <br />structures. Detailed information concerning the drainage and sediment control <br />plans has been developed by the SDAP Contractor. The sediment pond and <br />drainage structure report follows, The maps for this section are noted as <br />JFSA 1, Z and 3 and are found in the map pockets at the end of the <br />application. <br /> <br />. 23C <br />