Laserfiche WebLink
5n `~.Q5,3(~3.~ <br />2.05(3) Mine Facilities <br />The Pryor Mine will have surface facilities consisting of <br />an office trailer, a crusher and a 30 foot by 60 foot <br />pole shed used for minor repairs. The office trailer is used by the <br />superintendent and other individuals employed at the mine. This small <br />trailer contains items utilized by the supervisor during his day to day <br />operations. The small shop facility located adjacent to the office <br />trailer is used for minor repairs on the mining equipment. The portable <br />crushing facility crushes the coal to workable size. The only conveyor <br />at the Pryor Coal Strip Mine is a small one associated with the portable <br />crushing unit. Sediment pnd diversion ponds will be constructed to <br />control runoff and are shown on Map JFSA-1. Although the facilites are <br />intended to remain through this Permit term (2 years) in anticipation <br />of a permit extension, when all mining is complete the facilities will <br />be removed from the site and either dismantled or sold for scrap. <br />• Roads within the Partial Permit area will be laid out by the Operator to <br />suit his specific mode of operation. When the Operator has been selected <br />and has prepared his --oad plan, the information on road width, gradient, <br />surface, cut and fill, culverts, and drainage will be provided prior to <br />actual disturbance of the permit area. The proposed haul road locations <br />are shown on Map 6. <br />~. <br />r~.., 2~C' <br />L G: <br />