<br />Table 4.9.2-1. Trapper Mine topsoil pile Inventory. (I)
<br />
<br />Topsoil
<br />Pile ID
<br />Location
<br />Coordinates
<br />North East
<br />Size
<br />(acres) Approximate
<br />CYDS
<br />Created
<br />Date
<br /> DT4 D pit (E, og DT3®Ramp2 elev) 403,100 1,413,650 1.3 26,028 1989
<br /> HR3 E Haul road runaway site 404,550 1,417,900 0.5 3,779 pre 12/1977
<br /> HR4 D Haul road Anfo site to S curve 404,400 1,417,450 1.6 10,621 pre 12/1977
<br /> DR2T3 D ramp#3 Anfo add-on 404,100 1,417,150 0.3 8,788 6/85
<br /> MPS New A road near anfo silo 411,570 1,424,400 0.2 2,578 6/1990
<br /> SY1 Shopyard pullout expansion 413,660 1,419,250 0.2 900 1990
<br /> (MP6) A pit north of A76AB 409,250 1,424,000 2.7 77,708 1990
<br /> B3 B pit north of B2 410,850 1,408,750 2.2 60,606 1990
<br /> B4 C/B pit banana pile 410,650 1,406,820 3.0 42,588 1991
<br /> DS2 N. D pit substation(ramp #5) 402,910 1,417,160 0.2 835 1991
<br /> WP2 West Pyeatt Dam #1 413,200 1,424,190 1.3 10,404 1991
<br />~
<br />N MPT1 Middle Pyeatt temp (N. ramp access) 410,630 1,425,000 0.6 2,952 1991
<br />~ MP7 Middle Pyeatt sediment basin 411,000 1,425,350 0.2 645 1991
<br />Q A8 MR-111 Relocate MP6 b. AB (1991) 410,700 1,421,720 0.7 16,000 1991
<br /> HT1 T/S pile move(MP6 to H1) roadway 409,600 1,423,820 0.1 427 1991
<br /> HT2 T/S pile move(MP6 to H1) roadway 409,700 1,423,660 0.1 427 1991
<br /> HT3 T/S pile move(MP6 to H1) roadway 409,850 1,423,180 0.2 855 1991
<br /> HT4 T/S pile move(MP6 to H1) roadway 409,900 1,422,740 0.1 427 1991
<br /> HTS T/S pile move(MP6 to H1) roadway 409,870 1,422,460 0.4 1,712 1991
<br /> HT6 T/S pile move(MP6 to H1) roadway 410,100 1,422,250 0.1 427 1991
<br /> HT7 T/S pile move(MP6 to H1) roadway 410,280 1,422,180 0.2 655 1991
<br /> ASPT1 Scraper pit temporary near A9 403,900 1,424,070 1.1 15,822 1991
<br />~' sl ~i DTS Temporary pile near DT4 403,150 1,414,410 1.3 10,422 1991
<br />m ~ SDT1 S. D pit T/S strip(Wms Fork crest) 400,320 1,415,800 0.5 2,520 1991
<br />N DS3 D pit substation addition 404,260 1,414,450 0.1 188 1991
<br />~ AS1 A pit substation addition 410,000 1,414,160 0.03 129 1991
<br />Z ARdT A pit Mid-ramp push-back pile 410,160 1,423,950 0.1 1,960 1992
<br />Y j~
<br />~ to
<br />--- " -'
<br />--'--'-'---- " -----------'--------'-
<br />------- ^
<br />-^ '-----------
<br />-----------
<br />--------------
<br />---~--------
<br />-p I SUM 151.4 3,420,512 CYDS
<br />~
<br />~ (1) As of December 31, 1991.