Laserfiche WebLink
<br />A <br />N <br />Q <br />Q <br />D m <br />m ~ <br />~ ; <br />Z iN <br />D <br />~ I <br />~ i <br />Oi <br />~ ~ ~I <br />fl <br /> <br />Table 4.9.2-1. Trapper Mine topsoil pile Inventory. (1) <br /> Approximate <br />Topsoil Location Coordinates Size CYDS Created <br />Pile ID North East (acres) Date <br />C4 Lower C pit ~v~ 407,150 1,410,050 a 2.7 ~ 46,728 1988e_a <br />FS1 Anfo silo 410,250 1,410,950 0.2 550 1/80 <br />Al A field coal pile 409,850 1,411,300 1.3 12,944 6/77 <br />DT1 D pit temp N. 405,500 1,413,100 1.1 7,436 12/1987 <br />DT2 D pit temp middle 404,800 1,413,350 0.4 9,504 1988 <br />DT3 D pit temp S. 403,300 1,413,400 0.8 12,024 1988 <br />EG1 Elk dam 401,200 1,414,920 0.1 1,027 12/87 <br />A4 GB well site 410,070 1,417,400 0.5 7,805 pre1976 <br />SC2 S curve pile W. 406,250 1,416,900 1.2 13,608 12/78 <br />HR2 D haul road west(prestrip to ramp#2 402,800 1,416,650 1.9 21,800 12/78 <br />HR1 D haul road east(prestrip to E pit 402,400 1,416,500 2.5 20,100 12/78 <br />E7 E Yamp road 403,450 1,417,650 1.6 16,478 12/79 <br />LG1 Low grade coal topsoil pile 406,800 1,418,500 2.6 84,454 6/85 <br />ES 6 E9 S curve pile East (several addons) 406,000 1,418,150 3.2 91,587 pre79 <br />FS2 E fuel storage area pile 405,450 1,418,100 1.8 17,929 12/78 <br />SC1 pile west of E fuel storage pile 405,750 1,417,700 1.6 5,160 12/78 <br />E2 Middle E pit pile 404,400 1,423,100 4.6 25,238 12/78 <br />E1 E pit SE pile small 402,450 1,422,700 0.8 10,000 12/78 <br />E4 E pit SE pile large 401,900 1,422,650 2.9 34,010 pre 12/79 <br />E6 Castox gulch road E pit pile 401,200 1,420,950 8.9 208,968 pre 12/79 <br />E12 E pit regrade pile 403,850 1,422,350 4.2 73,278 1987 <br />A7 Mt Rowley 408,000 1,423,200 4.9 368,623 1987 <br />(AS) Mt Stevens 407,600 1,423,850 2.7 87,822 1988 <br />A6 North A pit sandrocks 409,650 1,421,100 3.2 94,494 1/1986 <br />E11 E pit Ute Gulch 402,100 1,420,100 0.2 1,100 1989 <br />SC3 S Curve east of (haul road runaway 407,400 1,417,400 1.2 24,749 1989 <br />B2 B pit (E. Buzzard drainageway) 410,250 1,409,950 5.8 146,540 1989 <br />A9 A pit scraper pit (South) 403,500 1,423,800 5.4 104,562 1988 <br />A10 A pit scraper pit (East) 404,400 1,425,250 2.3 54,090 1989 <br />All A pi[ boxcut 410,450 1,427,100 5.1 174,276 1989 <br />corn. <br />