Laserfiche WebLink
supply sources, quantities and water rights. Sections 4.3 <br />and 4.4 provide details about the augmentation plan and a <br />monitoring program, respectively. ' <br />4.1 OVERVIEW <br />The objective of the proposed augmentation plan is to <br />prow ida a means oY preventing impacts to valet rights caused <br />by: <br />a. PCC•s out-of-priority storage and consumptive use <br />of water from the already constructed and proposed <br />ponds (Figure 2); and <br />• b. Pit inflows that result in removal of water from <br />the shallow aquifer which supplies some surface-water <br />rights via springs and seeps. <br />The objectives of the plan are achieved as follows: <br />1. Any impacts to surface-water rights from Pcc•s out- <br />of-priority storage and water use will be prevented <br />by: providing an adequate discharge of eater by <br />pumping or other means of release from the ponds, or <br />releasing augmentation eater from the CC canal and <br />its distribution system. <br />19 <br />G[pY11AM5. or <br />• Attachment 2.05.3(3)-16-64 <br />REVISED MARCH 2O0G <br />