Laserfiche WebLink
<br />88 CW 55 <br />Peabody Coal Co. <br />Page 15 <br />{e) All diversions, del iv ec ies and ~-e lea se swill <br />util ize 'ex fisting structures and facilities <br />of the P,ppl icant or the Colorado <br />Co-operative Company, with the exception of <br />Pond 007 which will be huil[ before the <br />;aucla east Nine goes in GO operation. <br />(7) Applicant shall conduct the Eollowi nq described <br />monitoring programs to ensure that no injury to <br />vested water rights occurs. The monitoring <br />program will be used to confirm the volumes and <br />quantities of water being impac ted by Applicant's <br />activities. hRie re actual field measurements show <br />different effects than those estimated in this <br />plan, the monitoring pr og ram will provide the <br />basis for modification of operational details [o <br />prevent injury. The monito r. ing program will also <br />pr. ov fide information to the Division Engineer. and <br />the Colorado Co-operative Company to demonstrate <br />that no injury to vested or dec r. eed conditional <br />water rights is occurring. <br />(a) Pi t, inflo pwill be measured by installing <br />• ~ ~c_umulativeaPl on rie to rs~~dh `'tie dewa to ring <br />pu~mps~~used,,,to~...rem.ove .~suc~;,_in>ao_i~~`from the <br />mine area. ~ ~~ <br />(b) F,1.ow ga to s,,,in,,.Calamity Draw,~upstream _g£„~he <br />Nuela. Ea st.,yM,inera`il l~be measured wi [h ,a.~g age <br />install a[.~p,~suitable, ;to ._ttiea _Division <br />Engineer. <br />-~ <br />(c) Goo undwater mon.i tgring.,wel lg, will be .,used_[o <br />measure shallow .ayuife.r .g round wa ter levels <br />between, the.; NUC1a~Ea st pig and,,,,,Cal ain ity <br />Dr.`aii; a_nd,.be tween [he pit and the ~SVg st <br />La ter al ~Ir r"igatibn`Ditcb''." The numbe[ and <br />locations shall be mutually,~~ag'reed upon by <br />Applican t~"and the Divisio n: Eng ineer, ~ta k'ing <br />into ~"account site access and aquifer <br />conditions encountered. <br />(d) Ffonito r. ing equipment shall be installed.."in <br />phases, as Appl ican['s activities expand <br />causing ,g rea ter po to ntial~impacts. <br />(8) Applicant shall also maintain an accoun ting.and <br />repo rtinq System satisfactory to the Division <br />i <br />REVISED MARCH 2006 Attachment 2.05.3(3)-16-36 <br />