Laserfiche WebLink
n <br />LJ <br />C <br />80 CW 55 . <br />Peabody Coal Co. <br />Page 14 <br />injury [o vested wa to r'r ig hts that might rely on <br />this ara to r. When the Division Eng irteer detec- <br />mines Chat any out-of-priority storage in any of <br />the ponds is causing injury to vested water <br />rights, water will be released as follows: <br />(a) IE possible, releases will be made directly <br />Erom the pond causing the injury; <br />(b) If water quality standards or outlet works <br />design preclude releasing from that pond, <br />then stored water will be released from <br />another pond; <br />~.~ ~ (c) If no stored water can be Feasibly released, <br />then Applicant will release directly io the <br />stream a part of its consumotive use credit <br />fr. om Che High Line Canal at an appropriate <br />turnout point. <br />(d) Once the required release of repl ac em en[ <br />water has been made, the water s[o red <br />( out-of-priority will then be 1008 <br />• - consumable. <br />(6) Operation of this plan for augmentation shall be <br />in accordance with the water balance set forth in <br />Table 1 and the following conditions: <br />(a) Mitigation releases shall be made as set <br />fo rth in parag raph 6.C(2)(b), at the two- <br />diversion points along the High Line Canal <br />as set forth in paragraph 6.C(3). <br />(b) Indvstr ial uses are entirely (1008) <br />consumptive and shall utilize both <br />historical consumptive use credits and <br />separate pond sto rage rights. <br />(c) All diversions from the_ Hig h1Line Canal for. <br />Apolicart t's~~benefic iel use orysto rag eA forte <br />later use shall be measur. ed .~ <br />(d) AllLrelease s, from the ,High Line„Cap al~For <br />m3 tlgation and maintenance of his.to_rical <br />re turn"flows shall ~be measured. <br />• <br />REVISED MARCH 2006 Attachment 2.05.3(316-35 <br />