My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-30_PERMIT FILE - C1981008A (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2007-07-30_PERMIT FILE - C1981008A (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 9:02:09 AM
Creation date
11/25/2007 10:58:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
7/30/2007
Doc Name
Demonstration for Retention of Pond 007
Section_Exhibit Name
Section 2.05.3(3) Attachment 2.05.3(3)-16
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />LJ <br />C <br />80 CW 55 . <br />Peabody Coal Co. <br />Page 14 <br />injury [o vested wa to r'r ig hts that might rely on <br />this ara to r. When the Division Eng irteer detec- <br />mines Chat any out-of-priority storage in any of <br />the ponds is causing injury to vested water <br />rights, water will be released as follows: <br />(a) IE possible, releases will be made directly <br />Erom the pond causing the injury; <br />(b) If water quality standards or outlet works <br />design preclude releasing from that pond, <br />then stored water will be released from <br />another pond; <br />~.~ ~ (c) If no stored water can be Feasibly released, <br />then Applicant will release directly io the <br />stream a part of its consumotive use credit <br />fr. om Che High Line Canal at an appropriate <br />turnout point. <br />(d) Once the required release of repl ac em en[ <br />water has been made, the water s[o red <br />( out-of-priority will then be 1008 <br />• - consumable. <br />(6) Operation of this plan for augmentation shall be <br />in accordance with the water balance set forth in <br />Table 1 and the following conditions: <br />(a) Mitigation releases shall be made as set <br />fo rth in parag raph 6.C(2)(b), at the two- <br />diversion points along the High Line Canal <br />as set forth in paragraph 6.C(3). <br />(b) Indvstr ial uses are entirely (1008) <br />consumptive and shall utilize both <br />historical consumptive use credits and <br />separate pond sto rage rights. <br />(c) All diversions from the_ Hig h1Line Canal for. <br />Apolicart t's~~benefic iel use orysto rag eA forte <br />later use shall be measur. ed .~ <br />(d) AllLrelease s, from the ,High Line„Cap al~For <br />m3 tlgation and maintenance of his.to_rical <br />re turn"flows shall ~be measured. <br />• <br />REVISED MARCH 2006 Attachment 2.05.3(316-35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.