Laserfiche WebLink
• 2.05.3 <br />• <br />• <br />MR-24 <br />A PPRovED <br />Up to three gob vent boreholes GVBs are required over each longwall panel. <br />Additionally, exploratory holes will be drilled within the permit boundary. Run- <br />offfrom the related drill pads may not go through a treatment facility such as <br />a sediment pond. Run-off from the pads that does not report to a sediment <br />pond will be filtered through a sediment fence. Design of sediment fences <br />for three drill pad configurations are presented in Volume III, Exhibit 8 <br />beginning on page Exh-8 - 107. The three typical drill pads are designed on <br />a 3H:1 V slope, 5H:1 V slope and 10H:1 V slope. The typical sediment fence <br />configuration, berms and ditches for the various slopes and pad sizes are <br />shown on Maps 36 and 36a.. <br />The following table lists each drill hole and its design drill pad. <br />Drill Holes <br />Ori final Ground S lo a Information <br />Identifier Hole Name Sloe Identifier Hole Name Slo e <br />063 GVB-D-2B 10:1 077 GVB-D-5D 5:1 <br />041 GVB-D-7A 3:1 078 GVB-WD-1A 10:1 <br />042 GVB-D-5A 3:1 050 GVB-WD-2C 5:1 <br />044 GVB-D-46 5:1 080 GVB-WD-1B 10:1 <br />051 GVB-WD-3C 5:1 083 Geo-TCH-01 10:1 <br />052 GVB-WD-3B 3:1 084 Geo-TCH-02 10:1 <br />053 VB-W D-2B 3:1 085 Geo-TCH-03 5:1 <br />054 GVB-WD-3A 10:1 087 GVB-D-BC 10:1 <br />055 GVB-WD-2A 10:1 090 GVB-D-88 5:1 <br />059 VB-D-4C 10:1 092 GVB-D-9B 3:1 <br />060 VB-D-5B 5:1 094 GVB-D-BA&9A 3:1 <br />061 GVB-D-SC 10:1 096 IP-99-16 10:1 <br />062 GVB-D-6C 5:1 102 IP-99-11 3:1 <br />064 GVB-D-6A 5:1 102 IP-99-11 3:1 <br />065 GVB-D-6B 3:1 118 KM-1 10:1 <br />066 GVB-D-7B 5:1 119 KM-2 3:1 <br />068 DH-57 10:1 120 KM-3 3:1 <br />070 DH-58 10:1 121 KM-4 3:1 <br />075 GVB-D-7C 10:1 <br />2.05 - 33 - <br />7/02 <br />7~3~oZ <br />