Laserfiche WebLink
distribution center, water and sewage holding tanks. <br />9.3.3.2.1 Offices <br />This facility houses the manac3ement personnel and support groups <br />necessary to oversee the everyday functions of the operation. <br />Support groups include the engineering staff, safety department, <br />purchasing and sales department, clerical staff and laboratory. <br />9.3.3.2.2 Chanqehouse <br />This section of ttie Auxillary Facilities building is an essential <br />part of the operations as it provides the ct~angeroom and shower <br />facilities. This facility will also have an area where the miners <br />will pick-up and return their miner's cap lamps and self-contained <br />self rescuers, as well as their brass checks prior to going into <br />the mine. <br />9.3.3.2.3 Warehouse <br />with any operation there is a large inventory of equipment parts <br />and supplies which must be kept on hand to insure continued normal <br />operation. This facility provides the space necessary to store <br />these items and insure their protection against exposure to weather <br />conditions, theft, or misuse. However, due to ttie simplicity of <br />the proposed operation, warehouse space will be relatively small. <br />9.3.3.2.9 Shops <br />Maintenance of equipment is an everyday occurrence for any opera- <br />tion, and this facility provides the area and tools needed to <br />maintain the equipment used on the property. Major repairs will be <br />contracted to local machine shops. The shop will be arranged in <br />areas for repairs, maintenance of hydraulic, electrical, mechani- <br />~J <br />• <br />NCIG - Coal Ridge #1 4-28 ABC/1145/910509 • <br />