My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130837
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:43 PM
Creation date
11/25/2007 10:41:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200722900
IBM Index Class Name
Permit File
Doc Date
7/6/2007
Doc Name
Adequacy Letter
From
DRMS
To
Colorado Coal Resources, LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Description/Narrative <br />Guidelines for submittal <br />Describe type of project: Project involves drilling and coring of exploration hales and subsequent <br />reclamation of all exploration related disturbance. A total of 11 holes will be drilled within the project <br />area. The drillholes will range from 425 to 1,475 feet in depth. <br />2. Location and t}'pe of on-site facilities/structure: Except for the temporary setup and use of the drill-rig, <br />there will be no facilities/structures associated with the project. <br />Acreage and location of all disturbed areas: Existing Routt County Roads, existing coal haulage roads, <br />unimproved ranch roads and jeep trails will be used for drilling access where feasible. In the circumstance <br />where direct access to a proposed drill-site is not possible using existing roads, drilling equipment will be <br />moved overland the short distance from the road to the drill-site +a~ithout constructing a new road. <br />All of the 11 drill pads will be of uniform size, a maximum of approximately 100 x 100 feet (approximately <br />0.23 acres each). Pad construction will begin with removal of existing topsoil material for use in <br />reclaiming the pad. Available topsoil material will be stripped and stockpiled on the uphill side of the pad. <br />After stripping and stockpiling the available topsoil, minor grading and leveling will be completed to <br />establish the drill pad and accommodate the drilling and support equipment. Mud pits will be constructed <br />within the graded pad area. Generally two or three pits are required, with typical pit dimensions of 10 x 5 <br />feet and 6 feet deep. All drilling fluids will be contained within the mud pits, and all drilling supplies will <br />be contained within the area of the drill pad. Any runoff and associated suspended sediment from the drill- <br />pads will be controlled and contained by grading, and perimeter berms on the downgradient side(s) of the <br />drill pad, with release of any minor runoff accumulations in a controlled manner through rock check-dams, <br />.silt fences, and/or straw bales or wattles, as appropriate. <br />4. Type of equipment on site. Mobile drill-rigs, water truck, support vehicles, and geophysical logging <br />truck. <br />5. Type of vehicles used for project: See response to Item 9. <br />6. Number of employees. The exploration holes will be drilled with a rotary drill-rig, which typically <br />requires three workers per rig. It is anticipated that one drill-rig will be required far this project. CCR <br />plans to schedule operations on a 24-hour per day basis to minimize the time required to complete the <br />drilling program; exploration holes should be completed within 40 to 60 days. Other associated activities <br />(sampling, logging, and project management) may add another 2 to 3 workers to the number of individuals <br />working on-site at any given time. <br />Phasing plan. CCR plans to complete the proposed exploration activities during the summer and fall of <br />2007, however, weather or other unanticipated delays may result in the work extending into the spring and <br />summer of 2008. <br />8. Date of commencement. CCR plans to initiate exploration activities in early-July 2007, or as soon as all <br />necessary approvals are received <br />9. Completion date. The project, as noted in Item 7, is projected to be completed by summer 2008. <br />10. Location of stockpiles for topsoil, overburden, etc, if any. The only topsoil stockpiles (or windrows) <br />frill be located along any roads that are constructed and at the drill-sites. Any recovered soil materials will <br />be +vindrawed off the edges ofnewly-constructed roads and on the upslope perimeter of the drill-sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.