Laserfiche WebLink
RECLAMATION COST SUMMARY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I________________________________________________.,_I__________ <br />NA ~ No portals or shafts creased. <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ cost (f) <br />NA ~ No drill holds or monitoring wells created. <br />Subtotal (L): <br />M. MISCELLANEWS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (S) <br />7 ~ DemoLitionassume mass 5'll 'S'7 10'L a 50.18/cf ~ S45 <br />5 ~ Seeding per attached Task 5 worksheet. ~ E5,398 <br />NA ~ Fencing fencing not currently required. <br />b f Mob/Demob per attached Task b worksheet. ~ E1, 082 <br />Subtotal CM): 86,526 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): $14,584 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ <br />_ Item Description <br />_ ~ Cost (S) <br />_ <br />_ <br />____ <br />___I <br />1. ~ ____________ <br />________~_____________ <br />Public Liability Insurance.... _______ <br />1.550% ________I <br />of dir. ~ ___ <br />______. <br />5226 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5142 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 51,458 <br />4. ~ Job Superin[enden t..eq. op. serves as super. <br />Subtotal (A ): 51,827 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E16,411 <br />B, DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description <br />Cast (S) <br />1. ~ Minerals Program Admin. Fee at S.OOX of cntr.~ 5821 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (8): E821 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 52,647 <br />TO7AL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 517,232 <br />