My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130744
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:39 PM
Creation date
11/25/2007 10:38:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997089
IBM Index Class Name
Permit File
Doc Date
12/15/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY con['d sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I________________________________________________.,_I__________ <br />NA ~ No portals or shafts creased. <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ cost (f) <br />NA ~ No drill holds or monitoring wells created. <br />Subtotal (L): <br />M. MISCELLANEWS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (S) <br />7 ~ DemoLitionassume mass 5'll 'S'7 10'L a 50.18/cf ~ S45 <br />5 ~ Seeding per attached Task 5 worksheet. ~ E5,398 <br />NA ~ Fencing fencing not currently required. <br />b f Mob/Demob per attached Task b worksheet. ~ E1, 082 <br />Subtotal CM): 86,526 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): $14,584 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ <br />_ Item Description <br />_ ~ Cost (S) <br />_ <br />_ <br />____ <br />___I <br />1. ~ ____________ <br />________~_____________ <br />Public Liability Insurance.... _______ <br />1.550% ________I <br />of dir. ~ ___ <br />______. <br />5226 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 5142 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 51,458 <br />4. ~ Job Superin[enden t..eq. op. serves as super. <br />Subtotal (A ): 51,827 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E16,411 <br />B, DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description <br />Cast (S) <br />1. ~ Minerals Program Admin. Fee at S.OOX of cntr.~ 5821 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (8): E821 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 52,647 <br />TO7AL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 517,232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.