Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (E) <br />________I______________________.,_____________.._____________I__________ <br />NA ~ Stream channel reconstruction not required. <br />Subtotal (H): <br />____________ <br />I, EARTHWORK - DRAINAGE CONTROL SYSTEN INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (E) <br />____.,___I__________________________________________________I____________ <br />NA ~ Drainage control removed under Tasks 2, 3 <br />Subtotal (1): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Lost (E) <br />________I____________________________.,_____________„_______I____________ <br />3 ~ Replace OVB, Phase III, 2.5 ac, 3'D ~ 51,893 <br />4 ~ Replace topsoil, Phase I11, IV 8 Processing Area ~ E4,103 <br />8" depth <br />Subtotal (J): E5,996 <br />