My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130744
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:39 PM
Creation date
11/25/2007 10:38:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997089
IBM Index Class Name
Permit File
Doc Date
12/15/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOZER COST d PERFORMANCE DATA WORKSHEET <br />COLORADO DI'JISION OF MINERALS ANO GEOLOGY <br />Machine Make d Model: Cat O8H <br />Dozer Blade: SERI-UNIVERSAL <br />Attachment #l: ROPS CaD <br />Attachment #2: 3-shank ripper <br />Last Cost Revision: April, 1996 <br />BASE EQU IPNENT COSTS (CRG) <br /> <br />~i <br />sheet 1 of 2 sheet' <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association <br />Wage Rate Schedule <br />4) Caterpillar Performance Handbook <br /> ~-•-•--•---• Base Ownership d Overhaul Costs --••- -••-•--~• •-•--- •---•--- Base Operating Costs •-•---- ---• •. <br /> ~ Ownership ~ Over haul ~ Field Repair ~ <br /> ~ Depreciation CFC Overhead J Labor Parts) Labor Parts J Fuel Lube Tires G.E .( <br />Machine 516.90 56.35 56. 90 54.63 511.53 55.13 33.27 510. 44 53.28 50.00 51 .5` <br />Attachment #1 50.00 50.00 50 .00 50.00 50.00 50.00 50.00 50. 00 50.00 50.00 50. 0. <br />Attachment #2 53.40 50.76 50. 79 50.71 51.33 51.41 51.11 50. 00 50.29 50.00 50. 9::. <br />COST ADJUSR!EN7 FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cost: 6155.510.00 5273.420.25 0.769 <br />Econ, life hrs.•machine: 13.245 10.455 ~ 1.267 ~ <br />-attach. #1: 11.000 11,000 1.000 ~ <br />'attach. #2: 8.200 8.200 1.000 ~ <br />Annual use hours: 2.112 1,525 1.345 ~ <br />Mechanic's labor cost: 527.15 523.32 0.859 ~ <br />Fuel cost/gal.-gasoline: 51.15 51.15 1.000 ~ <br />-diesel: 30.99 50.99 1.000 ~ <br />Lube cost: 53.28 53.28 1.000 ~ <br />Tire life hours: 0 0 1.000 ~ <br />Tire factor: 0 0 1.000 J <br />Tire cost: 50.00 50.00 1.000 ~ <br />ADJUSTED EQUIPMENT COSTS <br />ACQUISITION COST BREAXDOWN <br />Cost Elements (CECG) Factor Adj. Cost <br />............................ ........ ........ <br />Base purchase price 5355.510.00 <br />Less dealer discount 0.142 550.482.42 <br />Plus freight 0.020 37.110.20 <br />Plus dealer charges' 0.005 51.771.55 <br />tHLRO estimate <br />Adjus [ed purchase price 5313.915.33 <br />Plus taxes: Sales @ 3; 59.417.45 <br />SHM @2.t 55.278.31 <br />Less Lire cast 50.00 <br />Less salvage value 0.179 556.190.84 <br />Net acquisition cost 5273.420.25 <br />.................................... ........ <br />Adjusted Ownership d Overhaul Costs -••--•--•~••--••--•--•• Adjusted Operating Costs <br />Acquisition cost 515.61 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/.a <br />Econ,life 'Dozer d ROPS 519.78 N/A N/A 35.87 514.61 56.51 511.74 N/A N/A N/A N/a <br />'Attach. #2 N/A N/A N/A 50.98 51.68 51.79 SL.41 N/A N/A N/A N/a <br />Annual usage 521.62 59.85 510.65 N/A N/A N/A N/A N/A N/A N/A N/a <br />Oauble shifts 516.22 54.92 35.33 N/A N/A N/A N/A N/A N/A N/A N/a <br />Triple shi([s SI4.42 33.28 33.55 N/A N/A N/A N/A H/A H/A N/A H/A <br />Mech.labor•Dozer d ROPS N/A N/A N/A 35.04 N/A 55.59 N/A N/A N/A N/A N/A <br />-Attach. $2 N/A N/A N/A 50.84 N/A 51.53 N/A N/A N/A N/A N/A <br />Fuel/lobe 'Dozer d ROPS N/A N/A N/A N/A N/A N/A N/A 310.4a 33.28 50.00 51.55 <br />'Attach. #2 N/A N/A N/A N/A N/A N/A N/A 50.00 30.29 30.00 50.9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.