Laserfiche WebLink
<br /> <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EOUI PMENT MOBILIZATION / DEMOBILIZATION <br />Task #... b Prep. by WHE Filename..M089-6 <br />Date.,... OS-Dec-97 Permit # N-97-089 Mine......stone Gravel Pit <br />Permit Action........ 112c application estimation <br />Task Description..... Haul reclamation equipment to and from job site. <br />HWRLY EQUIPMENT COST <br />______________ ______ NOTE - This is a list to select from, not a list of marWa tory items to inc lude. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GVW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 ton folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Cer : On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RT58D rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-tube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb GVW, 175 HP, diesel powered <br />Last Update: ________________________________ __________ _______________ __________________ __________ <br />December, 1994 <br />--------------- L[. Rig Med.R ig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T, 26-60 T. > 50 T. Car Crane Truck Truck Truck <br />-----------P ----------------- <br />Ownershi Cost/hr - 527.88 -------'----------------'------- <br />531.23 538.36 51.81 ---------- <br />519.89 -----------'-- <br />56.95 ------------------ <br />512.79 ---------- <br />55.71 <br />Operating Cost/hr = 526.84 529.29 534.27 55.12 523.40 518.53 524.52 58.00 <br />Operator Cost/hr = 521.40 522.03 522.03 521.24 520.86 521.24 521.24 521.24 <br />Helper Cost/hr = 520.60 521.24 521.24 50.00 50.00 50.00 50.00 50.00 <br />Total = 596.72 5103-79 5115.90 528.17 564.15 546.72 558.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />-------------------- Weight Ownership Haul Rig Fleet S ixe Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Lost/hr (no. hauled) Cast/hr Cost/hr Cost/ea <br />CAT D8N sU-Blade 39.50 542.12 8103,79 1 5145.91 5103.79 <br />CAT 623E E-Scraper 37.15 538.05 5103.79 1 5141.84 5103.79 <br />Revegecation Equi Anent 10.00 510.00 596,72 1 5106.72 596.72 <br />_________________________________________________________________________ ___ ___ _________________ ____ ____ __ <br />Subtotals 5394.47 5304.30 50.00 <br />