Laserfiche WebLink
<br />Hs. Ann Hodgson <br />Brannan Sand t Gravnl <br />December 16, 1980 <br />Page Two <br />Pit 29 <br />Exhibit E <br />1. If the use Is changed to residential on the shores of a lake, swlmrsing <br />will alsost certainly be an end use. If the shores ad]acent to these <br />potential residential altos are not left at 5'.'1, Brannan should pledge to <br />backfill them to this slope when and If such a residential use Is secured. <br />This should be done as a permit wndition. <br />Exhibit G <br />i. Whether water dries from a stockpiled, damp product or Is removed with <br />It, It is still taken from the area end used consumptively (as verified <br />to ma by the State Engineer). The percentage of water In such a product <br />can ba calculated (or estlnated). A water right should be available <br />to cover such a consumptive use. Pleose quantify this consumption of <br />water. Perhaps the 35 sh yes In the Fulton Ditch could cover this use <br />(If they are industrial use water). <br />Exhibit H <br />2. Brannan should commit firmly to shoreline Irragularltles es part of a <br />potential wildlife end use. The 5!'1 shallows would also be valuable <br />in this regard. <br />Exhibit L <br />I plan to recommend a bond of 589,435.00 for this operation. <br />I plan to contact you by phone concerning these matters. However, this <br />letter should organize them clearly for you, t feel that we must resolve <br />these items before Thursday morning's meeting. <br />Sincerely, <br />Nark S. Loye <br />Reclamation Specialist <br />Enclosure <br />MSVJm <br />