Laserfiche WebLink
• <br />EXHIBIT E <br />Reclamation Plan for the Mekelbur it <br />The reclaimed area will be managed for wildlife. <br />1. The topsoil will be xlemoved and stockpiled <br />prior to the gravel pit operations. <br />2. All banks will be shalped and graded to a 3:1 grade <br />or flatter. <br />3. The topsoil removed prior~to construction will be <br />uniformly applied after shaping and grading. Topsoil <br />layer should be approximately 6 inches thick. The <br />area will be tilled to bind the topsoil Frith the <br />existing soil. <br />4. Level type terraces <br />be constructed to p <br />designated. <br />5. Prepare the seedbed <br />6. The cover crop will <br />Types of cover crop <br />as shown on the plan map should <br />rotect the slopes on the areas <br />for the covercrop. <br />be planted during mid-May to mid-July. <br />are sorghum, sudan and sudax. <br />7. The area will be fertilized with not less than 40 pounds <br />Nitrogen and 40 pounds Phosphate. The fertilizer will be <br />worked into the soil prior to the grass seeding or at the <br />time of the grass seeding. <br />8. Grass seeding operations may be performed in late fall, <br />November 1 to May 1. <br />9. Grass seeding will be done with a grass drill. Grass will <br />be seeded directly into the remaining stubble left from <br />the cover crop. Seeding operations, where possible, should <br />be done across the slope. The seed is not be be planted <br />more than % inche deep. <br />10. Seed Mixture: <br />Pounds Pure Live Seed <br />Species Variety Per Acre <br />Sand Bluestem Woodward 2.0 <br />Little Bluestem Pastura 0.9 <br />Switch Grass Neb 28 0.6 <br />Sideoats Grama Butte 1.0 <br />Yellow Sweet Clover ------ 1.0 <br />