My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130309
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:17 PM
Creation date
11/25/2007 10:18:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Doc Date
2/27/1998
Doc Name
REMAINING ISSUES PARKDALE PROJECT FN M-97-054
From
DMG
To
AGILE STONE SYSTEMS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION OF MINERALS AND GEOLOGY <br />Dep. nmeni o(Nawral Resources <br />137 3 Sherman SL, Rnom 21 5 <br />Dcnvcr, Colorado 80201 <br />Phone: 13031 866-3567 <br />FA%:13031 832-H 106 <br />iiiiiiiiiiiiimiii <br />F COLORADO <br />February 27, 1998 Roy Romer <br /> Governor <br />Mitch Albert, President (amen 5. Lochhead <br />Execmive Director <br />Agile Stone Systems, Ine. Michael B. Long <br />6435 $OUth Pontiac CL Division Dveaor <br />Englewood, CO 801 1 I <br />Re: Remaining Issues, Parkdale Project, File No. M-97-054 <br />Dear Mr. Albert: <br />The Division has completed its review of your amended Parkdale Project 112 permit application. As I <br />discussed with you by phone today, there are 6 issues that we request you address as soon as possible. This <br />can be done by committing to incorporate the following list of items into your permit application. <br />1. Agile Stone Systems will mazk the granite and sandstone quarry sediment control ponds to show <br />where the 50% sediment storage azea will be and clean the ponds when they reach that level, prior to <br />adding additional sediment. <br />2. Within 60 days of permit issuance, Agile Stone Systems will provide a written plan for testing various <br />mixtures of plant fines and topsoil as a reclamation plant growth medium. The location of the test <br />plots will be marked on the permit mining plan map. The most suitable mixture will be used in <br />accordance with the granite quarry reclamation plan. <br />3. Topsoil stripping will be limited to two (2) bench widths in the granite quarry and 100 feet in advance <br />of gravel extraction in the gravel mining areas. <br />4. Within 60 days of permit approval the reclamation plan map will be modified to show the proposed <br />topography of the permanent visual noise berms. <br />5. The financial warranty (reclamation bond) shall be set at $276,700.00. <br />6. Blasting will be conducted in such a manner that airblast levels at the closet off-site residential <br />structures will be 134 decibels or less. Blasting records will be kept for 3 years for each quarry blast <br />and will be available for inspection by the Mined Land Reclamation Division. The blast records will <br />consist at a minimum of the following: <br />They must contain the name of operator conducting the blast. <br />They must include the la:ation, date and time of the blast. <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />
The URL can be used to link to this page
Your browser does not support the video tag.