My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130223
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:13 PM
Creation date
11/25/2007 10:15:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
RULE 2.05 OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Subsoil and topsoil materials will be redistributed in a thickness <br />approximately equal to that which was removed. Replacement of the <br />subsoil material will occur first followed by the topsoil material <br />ollowing redistribution of the soil materials the final surface <br />will be graded to provide a reconstructed soil profile similar to <br />that which was originally in place prior to disturbance. This will <br />assure a uniform stable thickness which is capable of restoring the <br />post-mining land uses. <br />Topsoil and subsoil material will be redistributed utilizing large <br />rubber tired scrapers to haul the topsoil and subsoil materials <br />from stockpiles or from areas where it is being removed prior to <br />mining. These rubber tired scrapers will spread the topsoil and <br />subsoil materials in sequence and at approximate thicknesses as <br />designated by the pre-mining soils depths. Data which indicates <br />various depths of soils and subsoils are located within Exhibit 4, <br />Baseline Soils Information. The schedule which GEC Minerals, Inc. <br />• plans to follow is shovm in Table 2.05-3, Affected Areas for <br />Mining and Reclamation. <br />After topsoil and subsoil materials have been redistributed the <br />topsoil will be scarified with a chisel plow or equivalent piece of <br />equipment to eliminate compaction caused by rubber tired scrapers. <br />This treatment promotes root penetration and infiltration of water <br />to the vegetation. <br />Wind and water erosion is controlled prior to seeding and after <br />topsoil and subsoil redistribution by leaving the area in a rough <br />condition. At the completion of the topsoil and subsoil redistri- <br />bution the area will be mulched to also minimize potential wind and <br />water erosion. The mulch will be crimped to ensure that it is <br />stable and stays in place. Following the mulching operation the <br />seed will be either drill seeded or broadcast seed on the areas <br /> <br />2.05-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.