My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130223
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:13 PM
Creation date
11/25/2007 10:15:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
RULE 2.05 OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />• 999 <br />Sf~ Doc Date:lz/11/2001 <br />I RULE 2.05 OPERATION AND RECLAMATION PLANS <br />2.05.1 Objectives <br />The comprehensive and detailed information on the planned mining <br />operation at the GEC Minerals mine are provided within this <br />section to ensure that the Colorado Mined Land Reclamation Division <br />is provided with detailed information in order that this operation <br />be conducted in compliance with the Colorado Surface Coal Mining <br />Reclamation Act of 1973, as amended. <br />2.05.2 Operation Plan - Mine Plan Area <br />GEC utilizes an open pit type mining method wherein five (5) <br />active benches, one on each seam, are utilized to remove the coal <br />and overburden for that seam. Overburden is hauled from the active <br />• bench to the backfill area which has already been mined. Within <br />this operation overburden is drilled and blasted prior to loading. <br />A hydraulic shovel and front end loaders are used load the <br />overburden into end dump trucks for haulage to the overburden <br />dump or backfill area. Coal is ripped with crawler tractors <br />and loaded by front end loaders into end dump trucks for haulage <br />to the tipple area. <br />Extra care is taken to be sure that all coal is cleaned prior to <br />ripping and loading. In addition, no ribs or fenders are left in <br />an attempt to recover as much coal as possible. Areas exist where <br />the coal seams have been mined by underground methods. GEC Minerals <br />Inc. currently attempts to recover as much of the pillars within the <br />abandoned underground mines as possible to maximize the overall <br />recovery of the coal resource. <br />For purposes of this permit application, the area to be mined <br />• during the next five years is synomymous with the permit area. <br />However, GEC Minerals does plan to continue mining in adjacent <br />areas after 1985. <br />2.05-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.