Laserfiche WebLink
PART I <br />Page le of 19 <br />Permit tlo. CO-0000213 <br />B. NONITORINC REQUIREMENTS (Continued) <br />2. Montioring Requirements Applicable During Ac[ive Periods 1/ (Lontinued) <br />Effluent Parameter <br />Measurement Frequency d/ <br />Sample Type e/ <br />Flow, MCD <br />Total Suspended Solids, mg/1 <br />Total Iron, mg/1 <br />011 and Crease, mg/1 f/ <br />pN, s.u. <br />Settleable Solids, ml/1 j./ <br />Salinity p,/ <br />Weekly <br />Monthly <br />Monthly <br />Weekly <br />Weekly <br />Weekly <br />Quarterly h/ <br />Instantaneous <br />or Continuous <br />Crab <br />Crab <br />Visual or Grab <br />Grab <br />Crab <br />Grab <br />Reporting of the above data shall be on a quarterly basis. Refer to <br />Part I.D.2 for specific requirements. Should a pcecipitation event or <br />snowmelt occur, the permittee shall submit proof in order for an <br />exemption to be claimed. Said proof shall be submitted as an <br />attachment to the Discharge Monitoring Report (DMR) for the appropriate <br />period. <br />• Sampling by Che permittee for compliance with the monitoring <br />requirements specified above shall be performed at the following <br />locations(e): Discharge points 001, 002, 003, 004, 005, and 006, as <br />shown in Figure 1 on page lf. <br />Monitoring by the Division for the purpose of compliance and/or <br />enforcement of the effluent limitations shall be performed as per <br />"Sample Type" specified above. <br />See Part I.C. for Footnotes. <br />Code: i - 10 Date:• 1 - 84 <br /> <br />7-6-7 <br />