Laserfiche WebLink
PART I <br />Page ld of 19 <br />Permit No. CO-0000213 <br />B. MONITORING REQUIREMENTS <br />1. Monitoring Requirements Applicable During Inactive Period k/ <br />In order to obtain an indication of the probable compliance or non- <br />compliance with the effluent limitations specified in Part 1.A, the <br />permittee shall monitor all effluent parameters at Che following <br />required frequencies": <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br />Flow, MCD Monthly Instantaneous or <br />Continuous <br />Total Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 !/ Monthly Grab <br />011 and Crease, mg/1 Monthly Visual or Grab <br />pH, s.u. Monthly Grab <br />Salinity Quarterly Crab <br />* The permittee shall notify the Division in writing upon resumption of <br />active operations. The monitoring requirements of Yart I.B.2 on the next <br />page shall automatically apply during active periods. <br />• Self-monitoring samples taken is compliance with the monitoring <br />requirements specified above shall be taken at: Discharge points 001, <br />002, 003, 004, 005, sad 006, ae shown in Figure 1 on page lf. <br />2. Monitoring Requirements Applicable During Active Periods k/ <br />Ia order to obtain an indication of the probable compliance or non- <br />compliance with the effluent limitations specified in Part 1.A, the <br />permittee shall monitor all effluent parameters at the folloxiag <br />frequencies: <br />See Part I.C. for Footnotes. <br />Code: 1 - 10 Date: 1 - 84 <br />7-6-6 <br />