My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130072
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:03 PM
Creation date
11/25/2007 10:08:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pg 780-141 to 780-237
Section_Exhibit Name
Part 780
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. Material Disassembly and Loading <br />• a) Transformer <br />Approximate size 11.5' X 8' X 11' <br />Remove from pad and place on trailer <br />Assume cost of $202.00/hr for labor and equipment <br />2 hours X $202/hr = $404.00 <br />b) H-frames <br />Approximate size 15' (2 posts) 10' (cross post) for each <br />H-frame for a total of 9 posts <br />disassemble and load on dump trucks or trailer (2 laborers) <br />$37.80 X 2 hours = $75.60 <br />c) Concrete pad removal <br />Approximate size 12' X 6' X 1' = 2.7 CY <br />Removal/load cost - $3.70 CY <br />2.7 CY X $3.70 = $9.99 or $10.00 <br />• III. Total cost for substation dismantling and removal - $512.10 or <br />$512.00 <br />B. Stoker Oiling System <br />I. Tank removal <br />Remove from area and place on flat bed truck <br />Assume cost of $202/hr for labor and equipment <br />.5 hr X $202/hr = $101.00 <br />II. Concrete removal <br />Approximate size <br />Slab 6' X 9' X <br />Walls: 2 each 6' <br />2 each 9' <br />Assume removal <br />4.78 CY X $3.7 <br />1' = 54 ft' <br />X 2.5' X 1' <br />X 2.5' X 1' <br />and load cos <br />CY = $17.69 <br />2.00 CY <br />30 ft' = 1.11 CY <br />45 ft' = 1.67 CY <br />t of $3.70 CY <br />or $18.00 <br />. III. Total Cost for Stoker Oiling System Loading and Removal = $119.00 <br />780-141 (f) <br />
The URL can be used to link to this page
Your browser does not support the video tag.