My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE130072
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE130072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:03 PM
Creation date
11/25/2007 10:08:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pg 780-141 to 780-237
Section_Exhibit Name
Part 780
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Energy Fuels' success in maximizing coal recover is evidenced by <br />• historical data for an 18-month period -- January, 1978 to July, 1979 <br />which shows a remarkable 87% coal recovery rate. Energy Fuels will <br />strive to maintain the highest recovery rate possible in the operations <br />proposed in this permit application. <br />Tipple Modification Bond <br />As the topsoiling and revegetation of the tipple area is addressed <br />elsewhere, the following bond calculations concern only the removal and <br />disposal of the material associated with the substation and stoker <br />oiling system. <br />Substation <br />1) Removal of transformer and disposal to local land fill <br />2) Removal and disposal of H-frames, fence, and concrete <br />Stoker oiling system <br />• 1) Removal and transport of 500 gallon tank and 12,000 gallon storage <br />tank <br />2) Removal and disposal of concrete materials around 12,000 gallon <br />tank <br />Assumptions: <br />1) Labor $18.90 per hour <br />2) Truck/trailer use to transport transformer to local land fill <br />3) H-frames, fence, and concrete disposed of at local land fill using <br />a dump truck <br />4) 500 gallon and 12,000 gallon tanks transported for use elsewhere <br />A. Substation <br />I. Fence Removal: 8' fence <br />150 linear feet <br />150 linear feet % 100 feet/hr = 1.5 hour <br />1.5 hour X $15/hr = $22.50 <br /> <br />780-141 (e) Revised 08/04/87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.