Laserfiche WebLink
Car Top Sampling Tower & Parking Area <br />• A. Removal of Tower <br />1. 16 hours of general labor time required to remove tower <br />2. General labor wage - $15/hr <br />3. One time of $150 to remove tower from site <br />Labor 16 hours X $15/hr = $240.00 <br />Removal fee = $150.00 <br />$390.00 <br />B. Pad Removal <br />1. 8' X 10' X 1' = 2.g6CY of concrete, say 3CY <br />27 <br />2. $3.70/CY for removal <br />3 X $3.70 = $11.10 <br />. C. Road Base Material Removal <br />1. 10' X 20' X 1' = 13.3 CY, say 13 CY <br />2. One time removal fee = $300.00 <br />D. Culvert Removal <br />1. One laborer - 4 hours <br />2. 4 hours X $15/hr = $60.00 <br />E. Bond Summary <br />TOWER REMOVAL $390.00 <br />Pad Removal 11.00 <br />Road Base Material Removal 300.00 <br />Culvert Removal 60.00 <br /> $761.00 <br />lOX Admin Fee 76.10 <br /> $837.10 <br />Say $850.00 <br /> <br />MR 90-49 780-141(i) Revised 04/26/90 <br />