Adequacy Review-Slurry Wall Cost Estimate and Slope Stability Analysis
From
DMG
To
Tetra Tech-RMC Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3567 <br />FAX: (303) 832.8106 <br />COLORADO <br />D I V t 5 l O N O F <br />MINESIRALS <br />GEOLOGY <br />0.ECLAN ATION•NINING <br />YAFETY•YCIENCE <br />DATE: August 29, 2004 <br /> sin Owens <br /> Governor <br />TO: Lary Oehler RuYYeu ceolge <br /> Executive Director <br />FROM: Allen Sorenson Renard w. Cattany <br /> Division Director <br /> <br />RE: Natural Resource Trustee <br />Reclamation Cost Estimate and Pit Wall Stability Analysis, Aggregate Industries, <br /> Tucson South Resource Gravel Pit, File No. M-2004-044 <br />The Division ofMinerals and Geology (DMG) has reviewed the suggested slurry wall bond amount <br />included in Exhibit L to the Tucson South Pit application. The unit cost of $3.00 per face square foot of <br />slurry wall is appropriate for bonding purposes. However, the Applicant has incorporated eligibility for <br />the 20 percent slurry wall bonding option described in DMG written guidance and policy memoranda) <br />iato their proposed reclamation bond amount. The rationale for the 20 percent bonding option available <br />to Operators installing slurry walls for a post mining land use of developed water resources, is as <br />follows: <br />An Operator provides design plans, specifications, and a quality assurance plan for DMG review <br />and acceptance. <br />The DMG makes a determination that a slurry wall constructed in accordance with the plans and <br />specifications, and under the approved quality assurance program, has a high probability of <br />effectively meeting leakage criteria for sealed reservoirs established by the State Engineer. <br />The Operator must commit to DMG that mining will not intersect ground water until the DMG <br />has reviewed and accepted the final slurry wall construction report, including quality assurance <br />test results. The 20 percent bond is a contingency against excessive leakage that maybe <br />detected during final testing of the sealed reservoir that would require repair or replacement of <br />potions of the slurry wall, or other actions to seal the leaking areas. Once the reservoir has been <br />found satisfactory by the State Engineer, Ure Operator may request release of the 20 percent <br />slurry wall bond. <br />The Operator is strongly encouraged to confer with the DMG prior to implementing any changes <br />to the slurry wall plans or specifications that may occur prior to or during constmction. If <br />substantive changes to the plans and specifications aze implemented without DMG concurrence, <br />and during review of the final construction report DMG detemrines that the changes diminish <br />DMG's degree of confidence that the slurry wall will create an effective leakage barrier, the <br />DMG may determine that the Operator is not eligible for the 20 percent bonding option. <br />Alternatively, the Applicant may work through the State Engineer's Office (SEO) to obtain approval of <br />plans, specifications, and quality assurance procedures, and provide documentation of SEO approval to <br />the DMG. Further, the Operator must pmvide documentation of SEO acceptance of the final slurry wall <br />construction report to DMG prior to excavation that would expose ground water in the pit. <br />I September 2000, "Guide to Specifications Prepazation for Slurry walls and Clay Liners as a Component of a Colorado <br />Mined Land Reclamation Permit," Colorado Department of Natural Resources, Division of Minerals and Geology. <br />Office of Office of Colorado <br />...d na..l....~r,.,n Aniwn and In~ryi.m AAl.,ne r._r._. __r r.._ <br />